{"id":17321,"date":"2023-04-18T11:28:49","date_gmt":"2023-04-18T05:43:49","guid":{"rendered":"http:\/\/livedang.com\/?p=17321"},"modified":"2023-04-18T11:28:49","modified_gmt":"2023-04-18T05:43:49","slug":"hapurkhola-bridge-constructed-not-completed-in-seven-years","status":"publish","type":"post","link":"https:\/\/livedang.com\/?p=17321","title":{"rendered":"Hapurkhola Bridge constructed not completed in seven years"},"content":{"rendered":"<p style=\"font-weight: 500;\"><strong>Tulsipur,\u00a0 18 April :<\/strong>\u00a0\u00a0It has been around seven years since construction of Hapurkhola linking Duruwa-Kothari began in Tulsipur sub-metropolis-15. But, the bridge construction is half finished till this date.<\/p>\n<p style=\"font-weight: 500;\">In absence of the bridge, the locals have been facing trouble in their movement. The contract for the bridge construction was awarded to SPA Surya JV Construction Company of Surkhet in a way to complete the construction four years back.<\/p>\n<p style=\"font-weight: 500;\">The contract of Rs 105 million was awarded to the company in Asoj 2073.<\/p><div class=\"hvnkr6a72e5bcb94a8\" ><div class=\"row\">\n<div class=\"col-md-4\">\n<img src=\"http:\/\/livedang.com\/wp-content\/uploads\/2024\/06\/1.jpeg\" alt=\"\" width=\"883\" height=\"490\" class=\"alignnone size-full wp-image-28364\" \/>\n\n\n<\/div>\n\n<div class=\"col-md-4\">\n<img src=\"http:\/\/livedang.com\/wp-content\/uploads\/2024\/06\/2.jpeg\" alt=\"\" width=\"1536\" height=\"999\" class=\"alignnone size-full wp-image-28365\" \/>\n\n\n\n<\/div>\n<div class=\"col-md-4\">\n<img class=\"alignnone size-full wp-image-39258\" src=\"http:\/\/livedang.com\/wp-content\/uploads\/2025\/08\/WhatsApp-Image-2025-08-19-at-09.27.03_aae3e5c6.jpg\" alt=\"\" width=\"1600\" height=\"1530\" \/>\n\n<\/div>\n<\/div><br><\/div><style type=\"text\/css\">\r\n@media screen and (min-width: 1201px) {\r\n.hvnkr6a72e5bcb94a8 {\r\ndisplay: block;\r\n}\r\n}\r\n@media screen and (min-width: 993px) and (max-width: 1200px) {\r\n.hvnkr6a72e5bcb94a8 {\r\ndisplay: block;\r\n}\r\n}\r\n@media screen and (min-width: 769px) and (max-width: 992px) {\r\n.hvnkr6a72e5bcb94a8 {\r\ndisplay: block;\r\n}\r\n}\r\n@media screen and (min-width: 768px) and (max-width: 768px) {\r\n.hvnkr6a72e5bcb94a8 {\r\ndisplay: block;\r\n}\r\n}\r\n@media screen and (max-width: 767px) {\r\n.hvnkr6a72e5bcb94a8 {\r\ndisplay: block;\r\n}\r\n}\r\n<\/style>\r\n\n<p style=\"font-weight: 500;\">Locals are being disappointed for protracting the construction of the bridge. &#8220;It has been over seven years since the construction started&#8221;, he said, adding, &#8220;The construction ahs not yet been completed. Its really troublesome for the general public&#8221;.<\/p>\n<p style=\"font-weight: 500;\">\u00a0The contractor has been extending the timeline for the construction of the bridge in different pretexts.\u00a0<strong><em style=\"font-weight: var(--bs-body-font-weight);\">(RSS)<\/em><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Tulsipur,\u00a0 18 April :\u00a0\u00a0It has been around seven years since construction of Hapurkhola linking Duruwa-Kothari began in Tulsipur sub-metropolis-15. But, the bridge construction is half finished till this date. In absence of the bridge, the locals have been facing trouble in their movement. The contract for the bridge construction was [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":17322,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-17321","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"jetpack_featured_media_url":"https:\/\/livedang.com\/wp-content\/uploads\/2023\/04\/5.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/livedang.com\/index.php?rest_route=\/wp\/v2\/posts\/17321","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/livedang.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/livedang.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/livedang.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/livedang.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=17321"}],"version-history":[{"count":1,"href":"https:\/\/livedang.com\/index.php?rest_route=\/wp\/v2\/posts\/17321\/revisions"}],"predecessor-version":[{"id":17323,"href":"https:\/\/livedang.com\/index.php?rest_route=\/wp\/v2\/posts\/17321\/revisions\/17323"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/livedang.com\/index.php?rest_route=\/wp\/v2\/media\/17322"}],"wp:attachment":[{"href":"https:\/\/livedang.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=17321"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/livedang.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=17321"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/livedang.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=17321"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}